Sewage Treatment Plant

Job Specification:

We identified that the clients existing sewage treatment plant was not processing and treating waste. On investigation we found that their existing site was undersized and unable to cope with the daily flows running through it.

We were tasked with supplying and installing a new larger treatment plant that could cope with the daily water discharge/flows of the site. Once the plant had been sized we then had the task of installation. This involved the use heavy plant machinery including the use of a crane to lift the new Klargester treatment plant into position.

We were faced by many challenges on this project including the fact that the new plant was being installed quite close to a lake which meant the ground water table was quite high.

CLIENT

Kier / SCC

SECTOR

Commercial Sector

PROJECT DURATION

8 Weeks

PRODUCTS USED

Klargester Bio-disc / Alton Pump service pre-packaged pump chamber

PROJECT TYPE

Supply and install complete with all groundworks of a sewage treatment plant.

LOCATION

Chertsey – In the Runnymede borough of Surrey, England.

Ground Levelling
Digger Work
Preparing Ground
Sewage Treatment Plant Ground Works
Ground Levelled
Mesh Laid
Alton Pumps Van
Concrete Poured
Sewage Treatment Plant - Crane
Sewage Treatment Plant - Crane
Sewage Treatment Plant - Gabion Baskets
Sewage Treatment Plant - Fencing Erected
sewage treatment plant

Get In Touch With Your Project Requirements:

Our experienced project managers will discuss your requirements and provide an on site survey to assess your project. The Alton Pump Services team will work with you on your pump or drainage project from start to finish. Our team provide services across the south of England, London and throughout the UK.